Sunday, September 16, 2012

The Industrial Calculation Landscape, the challenge!!!!

Too often over the last 6 months the desire for managed calculations has come up when reviewing a project or site. Drilling in on the requirements it becomes clear, that the enterprise’s/sites are having trouble aligning, managing calculations/ measures and KPIs. Microsoft Excel has become the source of many of the calculations, providing the freedom for engineers to create Adhoc calculations. The Excel paradigm is an isolated one, ending up with 100s / 1000s of calculations. Many of the companies I talk to across different industries have initiatives underway to eliminate Excel as data source, they do not mind it as an analysis tool. The major chunk of work is to understand the current Excel sheets determine the measures and calculation within these, determine the common calculations and data sources, and then determine a way to create and manage calculations/ measures and KPIs with clear governance. Not and Easy Task!!!
Looking at the landscape of calculations/ KPIs there are 3 main types/ classes, with measures/ calculations within each of these classes.
Historians have had calculation engines associated with them for years, but this is the middle class, and looks at time series and summarizes, aggregates data based on time slices. This is key, but we see the increasing need for lower level calculations associated with equipment types, for delays, throughput, mass balancing etc. It is key that these equipment/ area calculations are apart of the templates of equipment, providing consistency across the instances. The hierarchical management of these calculations / measures so evolutions can happen and be easily rolled out across a site or sites. Also, these plant associated equipment calculations require having state, with the ability to trigger alarms/ events and workflows in a pro- active manner.
The top layers are what people call KPIs these will come across equipment, sites and creating realtime and historical measures and then KPIs'/ calculations.  These KPIs need to have state ability to be seen in dials, dashboards and be stored. They trigger operational boundary conditions for operators, plant and process people. They could be off site and at the enterprise, also triggering procedures based upon exception conditions.
When starting to look at this landscape, calculations and measures will be dependent on other calculations and the quality of these calculations. Also, the requirement to understand the impact of of calculation changes, providing a governance and control on these calculations. Driving the requirement for the  ability to visualization a spider dependency view/ graphic across calculations.  Companies will have to revisit their architecture, and how they will manage these calculations in order to achieve the full value longer term, as they will continue evolve. It is essential that a more holistic view is taken vs just one set of or class of calculations (e.g.| Historian as they form only one part of the jigsaw).
Certainly Invensys is evolving the ECS’s  (Enterprise Control)  approach to calculations at all levels based on the common drivers we seeing.

Sunday, September 9, 2012

Getting out from behind the desk/ control terminal!


 
The above comment was made to me by an oil and gas company, and when I enquired to their expectation, it was clear that they wanted to empower "controllers" (operators) to be responsible for more. Enable decisions to be made faster while also gaining consistency across teams and shifts.
Transforming the traditional role of sitting in a control room behind a terminal, to a dynamic role, where the operator can get up and roam to investigate, make decisions and take actions in a timelier manner. This concept embraces all of the concepts this blog has raised over the last couple of months and shows the transition in the industrial sector to focusing operational empowerment.   

By unleashing the controller from their seat, they are free to investigate, see for themselves, and interact with others with experience to make informed decisions faster.
What is the reason why users have been locked to the desk/ control room, why has this transition not happened successfully before?
It is simple, the requirement to be monitoring the plant. A traditional control room is the central place alarms, notifications were traditionally piped.
So to free up the user, to leave the control room, the user needs to empowered with situational plant awareness, freed from monitoring, shifting to the experience of exception based notification. As the user roams the plant, the user is still responsible, and aware, and able to make decisions across the plant he is responsible for even if he not in view of that a particular piece of equipment. Driving the requirement for the mobile device the user carries to allow notification, drill thru access to information and ability to collaborate so the dependency to sit in the control room has lifted.
The challenge with the “Integrated Operational Centers”,  these centers which are set up for sites, multi site control, is the responsibility of the operators is significantly increased, in some cases going from 100s of possible alarms to 10000s alarms, and the user is unable to monitor the system must be exception based.
The discussion of two weeks ago with “Advanced Process Graphics” is key as this provides and exception based view to the plant. “just follow the color” that easily shows the controller of pending situations. As the user needs to drill through to understand the situation he just clicks’ on the color no matter where it is on the screen, removing the barrier of having to learn the navigation of the device.
This situation was illustrated two weeks ago when I observed a user start from a desk top on a situation, leave the desk, where he had one layout, and then move to IPAD experience where the same information was displayed but a different layout. The user did not have to worry, as the screen on IPAD was grey, except for the particular equipment at fault which had a red outline. Watching the user he did care about the layout he just clicked the color and followed the drill through by following the color.
So freeing up people is not just about providing  mobile data and information must free them to navigate with freedom, no matter the format, no matter where they start an activity, and have access to everything.   Why now? The technology is here with wireless plants, commodity devices to suite different applications/ roles, and the desire and culture to enable the flexible team, and design to enable exception based notification.
Over the next few years this area of exception based design, and like the discussion last week “model driven” significant advances will be forth coming.  

Sunday, September 2, 2012

Why our User Interfaces must be come Model Driven?

I referred to “Model Driven “ navigation last week, and got some reaction that we are already there with ArchestrA Graphics. This made me step and re read what I in the last blog, and realise that I had assumed some understanding.
Yes today ArchestrA Graphics are built into the model in the objects etc, this is a significant step from the classic InTouch like window which the graphics are independent of the model, just linked, but many applications do not build in navigation to the model. My actually intention was not just these graphics in the model but take the whole operational experience to  level, that the model and views into this model for operational control etc, can be independent of the device and layout. Also, the model must be able to change freely and not a characteristic of what device or who will engage with it.
Similar to the web browser if you look at the web page content, it is design unaware of the device, the real estate etc that is available. The location which a page is displayed, or accessed is up to the browser consumer.
If we now take a look at the range of User Interfaces below, these likely will be all in one solution on the one namespace, with all users being able to access the same state and data of the plant. Interacting with plant and interface relative to their role’s actions. So in the example below you would have 5 plus user interface type experiences, different laoyouts due to device and role etc.
Now add to this the roaming user, with the increasing policy of “get out from behind the desk/screen”, where the available real estate on a mobile device calls for a different layout.
How can we design user interfaces the way we did in the 90s? Where we designed a HMI application for a role/ location, with a fixed layout and navigation experience.
Today engineers will continue to evolve the model of the plant, developing say a new process unit, including in this required interfaces (windows) that enable control, analysis etc. These windows, forms, specialized clients will be accessible to all users through their own user interface.
Avoiding people having to reengineer each user interface, each time the model changes. So to avoid this, the navigation of which windows are available at this level in the model, needs to be built into the model. Today some applications are doing this with ArchestrA Graphics in the application, but to go with this is need for each user to be setup their user interface layout.
This means each user/role can define their own layout, with panes as to where certain information is displayed. Where navigation come up, etc.
I saw a very good example of this two weeks ago, where navigation through the model could be through a tree, through the mimic drill, etc, and the model provides the context. As Invensys evolves the operational experience tools so that engineering and lifecycle costs reduce as the solution complexity increases, the above situation is a real one which we are making natural.
Consider your user interface designs to day, do not think narrowly to one role, one layout, it is time to move the user interface screens to the model, away from the role/ display etc, providing the freedom to have my own experience.

Sunday, August 26, 2012

Navigation needs to be a Natural Act!!!!

Last week I visited some sites and engineering houses as they developed new systems. What struck me was the amount of time, and effort we put into designing a forced navigation between screens and windows. Even though, I knew this in my mind, I asked Why?.
In designing navigational buttons,  thereby enforcing a method of navigating through the application, which then now needs to trained to the people. Why cannot the system has Natural navigation built from the application model.
So what is this about?
Simple in today’s environment we have a couple of areas effecting the operational environment:
  • Rotating people are in locations, role shorter times
  • Increase in responsibility and decision making requirements, requiring a significant increase in data and information the operator must absorb or react over.
Last week I discussed Advanced Process Graphics, and how the new coloring scheme where only exception is shown is key to a person’s day, not the pretty pictures, providing a practical way to address the second point of more information. This starts not just in the screen design but down in the data and information source so the system is managing by exception.
The top point I raised is the rotating staff, discussing this last week with a couple of customers, this is a huge issue, I have spoken before about Operator Training Systems, but along with that must come a “natural” navigation. The users need intuitive navigation around screens, accessing the information they need, to make the decision, and take the required action. The interface may not be the desktop or control room experience it may start there, but it may also be at home, on the web, or roaming.
Consider screens and navigation designed for the desktop, now consider the Ipad, where the real estate is smaller, experience is “touch not click”, the desktop design will probably not be practical. Does this mean as a designer you have design different windows, and especially different navigation experiences or has the paradigm changed that this one window must be able to hosted in both environments, and the navigation/ layout for the experience changes. Yes the day of the HMI Application is over, it’s layout and windows been specific to location/ device and experience.
Layouts need to define where windows appear, layouts will be associated with the device and person. Example: I may have my desktop control experience, but I will have my Ipad control experience, and a different one for industrial, mobile device experience. Each with their own layout, and associated navigation, yet the same windows and information can be accessed.
Model driven navigation is required, so as you drill through the experience, to different levels of the model, the navigational experience must evolve driven from  the model. This allows the evolution of the model to happen, with no change required to operational experience as the new model extensions will be naturally available.
People often ask me why cannot the classic InTouch application work for the modern HMI, well the HMI products like InTouch, Citect, Ifix etc were built for local, one experience, one device, that is why we are evolving the InTouch experience to modern requirement. Next week I want continue the discussion on the "Intutive" navigation concept.

Sunday, August 19, 2012

Change in Reaction Time due Advanced Process Graphics

Change in Reaction Time due Advanced Process Graphics

The transformation to Advanced ProcessGraphics aligned to the level shift in operational responsibility to achieve the operational agility needed in the “Flexible Operational Team”. In the last month, it has been rewarding to see two customers embracing this technique with results of straightforward, responsive Navigation.
The diagram below shows the evolution of the HMI graphic, in the 80s it was what I call the black DCS screen, to 90’s and 2000’s which we have a photo like graphics and many colors, to the drive today of uncomplicated, 2D graphics.
















When applied in practice, results of painless awareness become abundantly clear. Some companies have tested existing (90s) operational experiences and Advanced Process Graphics finding a 30+ minute improvement in responsiveness.  I was watching how an operator moved through a screen based on a condition. The situation came up on the main screen which was light grey, with a red highlight around the particular area that has an issue providing immediately awareness.The user drills into that areas screen seeing a blue symbol indicating a warning level of alarm condition on one equipment. Clicking on  the equipment, down the bottom of the layout the list of potential issues in dull grey, and one condition is highlighted with blue.
What was very clear the way in which the operator navigated he just followed the color, there was really no need to search a screen as everything was light grey except the high lighted area. Speaking with the operator, he said “he has come from a traditional black background screens(70s) the learning experience was easy as he did not learn how to navigate to screens, he just followed the situation (color)”.
I have also seen this on some experimental experiences in South Africa, showing the same results, this has made it black and white to me, that if we are to make our operational experiences inituative this is a good starting point.
The above diagram refers to two books the “High Performance HMI Handbook” explaining the why, and “ASM Guide” explaining the how, both a worthwhile read.  

Saturday, August 11, 2012

Operator Training Systems become the Corner Stone for Management of Change to a Flexible Operational Team.
Over the last month I have hosted a number of customer workshops on the evolution of Operational Teams, which you have seen in the discussion over the last couple of months is going through a significant change.
I enjoy these discussions, and brainstorming, especially with groups who have been charged with Operational Performance, and they have moved away from grinding out more value from capital assets (this is a very mature area with asset management) and have shifted their focus to the Human Assets. It is funny to think 10 years ago we were talking “lights out manufacturing” without humans, the best comment I have heard to this notion is that “turning the lights out makes it hard for operators to find their way to the control room”. The real change is people have realized that complex / agile decisions needed today require the human brain, so the role of people in the aligning of an operational process is key.
Human roles are becoming shorter, many rotating sites due to expertise, and changes in practices coming about all the time due to regulations, or increased efficiency. The introduction of Remote Operational Centers and the fact that we have dynamic teams on site, as well as the virtual team see the diagram below.
What came up in all the workshops was not just the technology of collaboration, but the challenge of “Managing the Change” in operational culture. It is great to people recognizing this, as it is the biggest hurdle to success. Why you may ask? A key concepts in the new operational environment is the move to Advanced Process Graphics which are very different operational experience to the 3d effects of the 2000s. (see the diagram below shows the evolution of operational experience below ).
These new graphical approaches provide fast recognition and action of situations; as well companies are trying to gain style, layout, and visualization standards. So now an existing operator is now going to move from their existing interface to a new interface with different experience which should be more efficient so they can handle more information, but it will be a leap of change. These new layouts, and experiences will enable consistency of operations over sites, collberation, and increased efficiency.
In all the discussions the concept of the “Operator Training System” (OTS) comes to front of mind to be critical in this “Management of Change” and also the reduction in the “Time to Performance”, as illustrated in the diagram below. Often the teams have come in with the thought that the OTS is a nice to have, but as we get into the discussion the realization that it is not just for training, it will enable:
·      The new operational experience can be tested and trained against in as many situations as possible. Enabling a transition of the operator from the old to new collectrative Advanaced expereince. With the level of the operator being tracked to see when they reach a level of satisfaction that means they can switch.
·       It provides a safe environment to test, and validate the new operational experience, making sure that it has been well tested.
·       Enable the Training of Operational staff on real situations
·       The ability to report on each Operators capabilities and effectiveness on an ongoiing basis.
·       A safe real environment to enable “operational Innovation” by letting your best Operators get into situations and innovate better procedures or capture their procedure so you can set up a standard procedure for that situation. The OTS provides the critical environment for Innovation that of allowing experimentation in a safe way.
·         The ability for experienced operational people to be trained on new locations / sites prior to being transferred, this includes the 3d Virtual environments which provide the physical familiarity.

By the end of these workshops OTS moves up to not a nice to have but an essential component on the evolution of the Operational Experience. I hope you are looking at OTS in a different light, I cannot see companies doing this evolution without OTS.

Sunday, August 5, 2012

Composite Frameworks What are They, How do they Play?


As we look at MES and Operational solutions the role of the consistent operational execution and experience is key to achieving operational consistency.
Traditionally companies have built User Interfaces to an API, with the calls needed to execution actions and transactions coded in. These have worked well especially within a plant. But a key to operational systems being effective and agile is their ability to adapt on a regular basis, this requires a sustainable and evolving system. This is especially important in form/ transaction activities where information is provided and where actions/ data input, and procedures  that need to be carried out. But the challengers of operational procedures:
ü  Operational Process cross-over functional domains and applications
ü  Lack of governance
ü  Agility
ü  Responsive manufacturing business processes
ü  Increase the performance of their people assets
 
So like the Business System who started introduce BPM (Business Process Modeling) leading companies in the industrial space are looking and asking why they cannot apply the same techniques in the Industrial/ production sector.
There is no reason! Yes the time line is more real time, triggers are real-time, and there are many roles with different time dimensions. But this also aligns with what the industrial world is very comfortable with that of “stable in control loops” we do this in automation with feedback (information) and correction (actionable procedures), what we are looking at are “operational loops”.
Providing a graphical configuration environment for the capture and defining of operational process including the validation of data input, and guide actions, working inline with the user Interface/ forms etc. Providing a framework for building of reusable forms, and reusable procedures that can be managed as templates and standards to enforce consistent operational practices. Empowering the operational domain people to develop, evolve and manage their procedures.
Most of all empowering the different roles in the plant, that operational close loop moving to an “activity” centric system where information, and action is driven from a consistent operational model and practices.